Katie and i installed the electric meter on the house. From the schedule 40 conduit underground we connected the schedule 80 up the wall. We mounted the panel to the house & drove the 2 ground rods in. All that needs to be done is connect the wires. The inspector comes out friday , then power in 2 weeks after inspection. We are very excited to have the conviance back again. I also pressure washed the concrete and put the hinges in the door to the attic. I also finished the ridge cap and screwed down the drip edge.