When the mason did the foundation he ran pipes under the footer . Our next step was to put elbows on them and extend the pipes above the finished floor level. Also i ordered 3 ton of pee gravel for the floor before the concrete was poured. Thank god a have my loader here to move it all. The rollbar on the machine just cleared the door opening i was able to drive it right in.As you see we wanted to have a ground level acsess to the basement !